Development and construction sites cleared to the approved tree plan and erosion plan, then handed to grading.

[Post Oak Land Clearing Denton](https://postoaklandclearingdenton.com/) offers and manages commercial land clearing across Denton and the west and north of Denton County, with the work done by licensed and insured contractors. A commercial job is cleared to someone else’s drawings: the site plan, the tree survey and preservation plan, and the erosion control plan. The work itself looks like any other clearing, but the sequence is set by the permits, the trees that must stay and the stormwater rules, and the job ends with a handoff to the grading contractor, not a finished pad.

## What happens on the first visit

The first visit checks the ground against the plan. Expect a walk of the limits of disturbance, the preserved trees and their protection fencing, the pad and drive footprints, staging and haul routes, overhead lines and creek edges, plus a look at which permits are already issued and which are still pending.

Commercial ground in the Denton area runs from flat Grand Prairie pasture on the west side to post oak woods in the Cross Timbers band through Argyle and south Denton, and the two clear very differently. Pasture with scattered mesquite opens up quickly. A wooded tract inside the city carries heritage post oaks, protection fencing and a preservation floor, and the plan decides which trees come out before any machine does. The walk also notes the clay: Sanger and Slidell clays on the west side rut deeply when wet, which matters when loaded trucks have to cross a site after rain.

## Clearing to the tree plan inside Denton

Inside city limits the Denton Development Code shapes a development clearing job more than the ground does. A tree survey and preservation plan has to accompany a site plan, preliminary plat, replat or clear-and-grade permit, whatever the tree count, prepared by an ISA or ASCA arborist, an SAF forester, a botanist, a trained surveyor or a registered landscape architect. Where no protected trees exist, one of them signs a notarized letter saying so.

The plan then sets the floor. At least 30% of the heritage and quality tree diameter inside the development impact area must be preserved; every landmark tree stays. Post oaks count as heritage trees from 6 inches in diameter, so a Cross Timbers tract reaches its preservation floor quickly. Trees removed beyond what the plan preserves are replaced at set ratios or mitigated at $200 per caliper inch paid in lieu. No protected tree may come down for development until the final plat is approved and the tree removal permit, $425, is issued. The city is reviewing changes to these rules, so the [Denton tree removal permit guide](https://postoaklandclearingdenton.com/guide/denton-tree-removal-permit/) is kept to the current text.

### Protecting the trees that stay

Most damage to preserved trees on a development site happens below the ground. A loaded machine crossing a root zone compacts the clay, a few inches of fill smothers roots, and a cut along the dripline severs them. Denton requires orange mesh protection fencing at least 4 feet high before any permit is released and before grading or brush removal, and it prohibits fill and excavation inside the dripline. Clearing routes are laid out to keep machines and haul trucks outside that fencing, and understory inside it, where removal is allowed, is cleared by hand or with light equipment. [Selective clearing](https://postoaklandclearingdenton.com/selective-clearing/) covers that method in more depth.

### Early clear and grade

The city can issue an early clear-and-grade permit before the building permit once the plat is filed, state watershed requirements are met and site inspections are complete. The submittal goes through eTRAKiT with the commercial application, a site plan with erosion control and drainage plans, and the tree plan, and the Watershed Protection Division inspects. The clearing and grading permit costs $453 and runs one year. If erosion controls fail, the city gives a cure period before a stop-work order and a referral to TCEQ.

## Stormwater coverage, the SWPPP and the Notice of Intent

Clearing is usually the first soil disturbance on a site, so stormwater obligations start with it. Under TCEQ’s construction general permit, TXR150000, activities that disturb 1 acre or more need coverage and a stormwater pollution prevention plan. Sites from 1 to under 5 acres are small sites; sites of 5 acres or more, or part of a larger common plan that will disturb 5 or more, are large sites and file a Notice of Intent, $225 electronically or $325 on paper. A single lot inside a subdivision counts as part of the common plan, so its size alone does not settle the question.

Controls go in before the soil opens. Silt fence along the low edges and a stabilized entrance are usually the first items on the plan, and Denton County TxDOT bids put installed silt fence at $3.40 to $5.00 a foot, though short runs cost more per foot. Who holds the permit as operator is settled before clearing starts, so the clearing work runs under the plan rather than around it. [Erosion control](https://postoaklandclearingdenton.com/erosion-control/) covers installation and upkeep.

## Creeks, floodplain and Environmentally Sensitive Areas

Denton maps Environmentally Sensitive Areas, and they stop routine clearing. Riparian buffers run 50 feet from the stream for channels draining 1 square mile or less and 100 feet for larger ones, and tree and understory removal is prohibited in buffers and undeveloped floodplain. Cross Timbers Upland Habitat is the other big one: where a contiguous forest block of 10 acres or more remains, nonresidential development keeps 30% of it natural and residential development keeps 50%. Disturbing an ESA beyond its limited allowances needs an Alternative ESA Plan with public hearings before the Planning and Zoning Commission and City Council. A field assessment settles where the lines fall, and the [clearing near creeks and floodplains guide](https://postoaklandclearingdenton.com/guide/clearing-near-creeks-and-floodplains/) explains how it works.

## Rules in the towns around Denton

Outside the city each town sets its own sequence, and none of it can be assumed. In [Sanger](https://postoaklandclearingdenton.com/service-areas/sanger/) no grading, clearing or fill starts without a stormwater plan and the Director of Development Services’ approval, and early grading needs a final plat submitted and accepted plus an engineer-sealed erosion plan; brush may not be left where it drains to a storm sewer or creek. [Argyle](https://postoaklandclearingdenton.com/service-areas/argyle/) protects listed trees from 3 inches, applies the rule to utility and pipeline easements, and requires an approved tree survey and protection plan before any site-work or grading permit. [Roanoke](https://postoaklandclearingdenton.com/service-areas/roanoke/) does not allow clear-cutting at all. [Justin](https://postoaklandclearingdenton.com/service-areas/justin/) requires a permit for any dirt work, and Krum requires a land development permit for clearing and grubbing. Unincorporated county land and the ETJ are confirmed per tract.

## Debris, finish level and the handoff to grading

A development site produces debris by the truckload, and where it goes is decided before the first tree falls. Brush and small trees can be mulched in place outside the footprint, logs stacked or hauled, and stumps and root balls [grubbed](https://postoaklandclearingdenton.com/clearing-and-grubbing/) out of pads, drives and utility routes and hauled or ground. Ash wood stays inside the emerald ash borer quarantine area unless treated, which affects where ash logs can go. Burning is not allowed inside Denton city limits, and on county land a land-clearing burn is allowed only when no practical alternative exists, which a mulcher or a haul route usually is. [Land clearing debris removal](https://postoaklandclearingdenton.com/land-clearing-debris-removal/) covers trucking and tipping.

The finish is a cleared, grubbed footprint with topsoil stockpiled where the plan calls for it, controls in place and preserved trees untouched. It is not a building pad: cut and fill, compaction and drainage shaping follow under [land clearing and grading](https://postoaklandclearingdenton.com/land-clearing-and-grading/) or the site’s own earthwork contractor. Solar arrays, storage yards and other open-ground projects follow the same path, with a finish matched to what the next trade needs.

## What commercial land clearing costs

Commercial clearing is priced per site, because the plan drives the cost as much as the vegetation. For scale, a TxDOT contract for 33 acres of roadside brush removal in Denton County drew bids of $1,360 to $2,000 an acre, with a low bid of $1,590. That is a public benchmark for large, open, easy-to-reach brush, not a development rate; wooded development land with preserved trees costs more per acre. Typical North Texas ranges for the clearing itself run from $1,500 to $3,500 an acre in light brush to $3,500 to $6,500 or more in heavy woods, with grubbing priced on top.

The drivers on a development site are the tree plan (fencing, handwork near keepers, mitigation at $200 per caliper inch), the stormwater controls, how much ground is grubbed, how far debris travels and how many utilities cross the site. For labor context, operating engineers and other construction equipment operators in the Dallas-Fort Worth metro earn a mean $26.51 an hour against $31.87 nationally ([BLS](https://www.bls.gov/oes/) OEWS). A wage is not a billing rate: the hourly price also carries the machine, fuel, trailer, insurance and overhead. The [cost per acre guide](https://postoaklandclearingdenton.com/guide/land-clearing-cost-per-acre/) lists the public fees, the [cost calculator](https://postoaklandclearingdenton.com/tools/land-clearing-cost-calculator/) gives a first range, and [what a land clearing quote should include](https://postoaklandclearingdenton.com/guide/what-a-land-clearing-quote-should-include/) shows how to compare bids line by line.

## What's included

- A walk of the site with the site plan, tree survey and erosion plan to confirm limits of disturbance and preserved trees
- A check of permit status before machines arrive: plat, tree removal permit, clearing and grading permit, stormwater coverage
- Clearing of the approved footprint by mulching, felling and loading, or a mix, kept outside protection fencing
- Grubbing of building pads, drives, parking and utility routes to the plan
- Topsoil stripped and stockpiled where the plan calls for it
- Debris mulched on site, stacked or hauled as agreed, with ash kept inside the quarantine area
- Silt fence and other controls on the plan installed before or as soil is opened
- A clean handoff to the grading contractor, with what was left noted

## Three ways a development tract gets cleared, compared

*Three ways a development tract gets cleared, compared*

| Option | Clear and grub the footprint | Clear the whole tract | Selective clearing to the tree plan |
| --- | --- | --- | --- |
| What comes out | Everything inside pads, drives, parking and utility routes | Every tree, stump and root on the property | Only trees and understory marked for removal |
| What stays | Trees and ground outside the footprint | Bare soil | Preserved trees, their root zones and buffers |
| Fits Denton tree rules | Yes, when the footprint matches the approved plan | Not where protected trees exist: 30% of their diameter must stay | Yes: built around the preservation plan |
| Stormwater exposure | Disturbed area limited to what is being built | Largest bare area and longest exposure | Smallest bare area |
| Debris volume | Moderate to high | Highest | Lowest |
| Best for | Most commercial and subdivision sites | Rare: where no tree rule applies and the plan uses the whole tract | Sites with heritage post oaks, buffers or conservation areas |

## Related resources

- [Do you need a City of Denton tree removal permit?](https://postoaklandclearingdenton.com/guide/denton-tree-removal-permit/): Which Denton properties the tree code reaches, which trees it protects, how preservation and mitigation are counted, and what to file before a saw starts.
- [What should a land clearing quote include?](https://postoaklandclearingdenton.com/guide/what-a-land-clearing-quote-should-include/): The lines that turn a price into a scope you can hold someone to, and how to compare two bids that look alike but describe different jobs.
- [Can you clear brush along a creek or in a floodplain around Denton?](https://postoaklandclearingdenton.com/guide/clearing-near-creeks-and-floodplains/): Why creek banks and floodplains are the most restricted ground to clear around Denton, how to tell whether a lot is affected, and what work is still possible.
- [How much does land clearing cost per acre in Denton?](https://postoaklandclearingdenton.com/guide/land-clearing-cost-per-acre/): Typical per-acre ranges, the public figures inside a Denton price, and why the same acre can cost twice as much on a different lot.
- [Clearing land in Denton, TX: what to know before the first machine arrives](https://postoaklandclearingdenton.com/guide/clearing-land-in-denton/): Methods, regrowth, stumps, debris, permits, taxes and timing on Denton clay, answered in the order the questions come up.

## How a clearing job runs

### Call or send the form

Acreage, address, what's growing and what you want the ground for.

### Walk the property

Trees to keep are marked, ground and access checked, permits listed.

### Clear

Mulched, cut or grubbed by the method agreed, working around what stays.

### Finish

Debris mulched or hauled, bare ground covered or silt-fenced.

## Commercial land clearing questions

### When can trees come down on a Denton development site?

Only after the final plat is approved and the Building Official issues the tree removal permit, and tree protection fencing has to be inspected before that permit is issued. Clearing that starts earlier risks the city's working-without-a-permit fee and a stop-work order, on top of mitigation for any protected tree lost.

### Does a one-acre commercial lot need a stormwater plan?

If clearing, grubbing and grading will disturb 1 acre or more, the site needs coverage under the TCEQ construction general permit and a stormwater pollution prevention plan. Under 1 acre it does not, unless the lot is part of a larger common plan of development. A Notice of Intent and its $225 electronic fee start at 5 acres.

### Can a developer clear-cut a tract in Roanoke before platting?

No. Roanoke's tree checklist states that no clear-cutting of land is allowed, and a council-approved tree preservation plan is required before construction on a site with protected trees. Removing 10 or more protected trees without a permit blocks zoning changes, plats and site plans for the property for 36 months.

### What does Sanger require before grading a new subdivision?

Sanger issues no construction permits until plans and plat are approved, but the Director of Development Services may allow early grading once a final plat is submitted and accepted. That needs an engineer-sealed erosion control plan, a stormwater plan, a copy of the Notice of Intent where one applies, and every control installed before grading starts.

### Who carries out commercial land clearing booked through Post Oak Land Clearing Denton?

Post Oak Land Clearing Denton offers and manages the job, from the plan review and walk-through to scheduling, and the clearing is done by licensed and insured contractors.

## Related services

### [Clearing and grubbing](https://postoaklandclearingdenton.com/clearing-and-grubbing/)

Trees cut, then stumps, root balls and buried organics pulled out where a pad, drive or pond will go, leaving bare soil for grading.

### [Erosion control](https://postoaklandclearingdenton.com/erosion-control/)

Silt fence, mulch cover and seeding put on cleared ground so the next hard rain leaves the soil where it is.

### [Clearing and grading](https://postoaklandclearingdenton.com/land-clearing-and-grading/)

Clearing, grubbing and rough grading done in order, ending with a shaped pad and drainage ready for the builder's next step.